Prep’d, installed, and match drilled the new right main ribs.
This entry was posted
on Friday, September 26th, 2008 at 10:12 pm and is filed under Empenage.
You can follow any responses to this entry through the RSS 2.0 feed.
Responses are currently closed, but you can trackback from your own site.